Keels and backbones: done, save for foil-shaping the keels.
Bulkheads: done and coated, not sanded for fillets yet, otherwise finished.
Lower hullsides: butted and waiting for coating on inner face
Lower long stringers: Cut and awaiting scarphing
Stems: made, not finished coating
skegs: same as stems.
Stands: all 4 made and padded
Remaining in Phase 1:
*Scarphing stringers
*coating inner hullsides
*attaching stringers to hullsides, planing tapers on the ends.
*coating and smoothing rest of stems and skegs.
*assembly of lower hull, including making spacer timbers fore and aft of backbone, stitching, and screwing
*opening of hulls, installing bulkheads
*glueing and then filleting.
ADDED TO PH 1:
Workignout the rudder lashing holes before going 3D
Long way to go.....but a long way already traveled.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment